Skip to Content

The #1 lean manufacturing app​

MRP + MES + PLM + Quality + Shop Floor + Maintenance

All you need in one single platform; fast and easy to use.

Real-time simulated operations

Simulate manufacturing orders with real-time capacity planning, components availability, and cost control.

Get just-in-time replenishment propositions and choose how to fulfill parts: make or buy, sub-contract, deliver from another warehouse, etc.

Planning that puts you ahead of schedule

Schedule manufacturing orders and plan resources with finite capacity planning.

Fine tune easily with the Gantt chart.

Record production and components


Use to process orders, accelerate operations, and reduce input errors. Works right out of the box, blazing fast, and with no latency.

Become a 

paperless company

The Shop Floor app helps streamline your manufacturing line. Through the tablet-optimized dashboard, you can organize workers, workcenters, worksheets, quality tests, and much more.

The perfect tool for Kaize​n


All the features

done right.

Powerful yet simple

Although Odoo has all the features you need to deploy a modern manufacturing line, it remains very simple to use, and does not require advanced trainings for workers.

Up/down stream traceability

Track components, or manufacture in batches (lots) or serial numbers. Get a clear traceability of all operations in just a click.

IoT integrations

Connect barcode printers, automate quality measures, or setup your machine from the shop floor app, using the IoT box.

Handle recurring invoices

Set the frequency of invoicing for subscriptions of recurring services and products.

Leverage by-products

Produce residual products by adding by-products to bills of materials.